in order to facilitate the relocation of an electrical meter from the ground to 1st floor UKPN has asked me to install a what they are calling a read head cut out within the 1st floor by the consumer fuse board to facilitate their new electrical meter position which will be installed by another party.
What is a red head cut out and why does it need to be there?
What is a red head cut out and why does it need to be there?