Request To Work Live

We used to sit on our apprentices and pull their shirts up and put a crocodile clip on each nipple and whack a 500 volts across them from our meggars lol, today it would mean a prison sentence I suspect, in my day it was initiation, just like having axel grease pasted around your wedding tackle was as well.
that sort of thing happend when i was in college lol, one guy liked setting fire to things etc and another liked megering people either with a megger or capacitor another just screwed people to the wall/floor etc
 
Tell the bloke who asked you to work live to put it in writing, so if anything happens your family can claim. I doubt he will ask again.
 
Probably like most Electricians on here I have drilled holes in top of live DB's. The usual bit of card underneath to protect any cables/swarf getting anywhere. I've only done this to get on with the job because of the complete rigmarole of getting into the DB. It has now come into place at my company just to prove dead we have to wear full arc flash PPE with balaclava, full face visor, coat and gauntlets!
 
Probably like most Electricians on here I have drilled holes in top of live DB's. The usual bit of card underneath to protect any cables/swarf getting anywhere. I've only done this to get on with the job because of the complete rigmarole of getting into the DB. It has now come into place at my company just to prove dead we have to wear full arc flash PPE with balaclava, full face visor, coat and gauntlets!
yup i have, the only time i have been nervous was on the top of a tripple extender fully extended

it was placed on the raised grass bank at quite the angle


edit 4mins later got a quick sketch up on paint

aeca4581b023f7befa514f58e8188947.jpg
 
Last edited:
yup i have, the only time i have been nervous was on the top of a tripple extender fully extended

it was placed on the raised grass bank at quite the angle


edit 4mins later got a quick sketch up on paint

aeca4581b023f7befa514f58e8188947.jpg

I'd prefer to drill into a live 3 phase DB personally.
 
Indeed, it is interesting to see and read about other Electrician's experiences and what is considered unsafe work though. Of course the ideal situation would to always work on completely dead installations and I'm sure the law would back you up on that but it certainly isn't the reality I work in or other electrician's I know locally. For instance, how do Electricians on here go about doing their EICR's? Do they isolate every other circuit in distribution board and only have the one circuit energised when needed? Or do they work inside a live DB? Obviously at some point you have to work live to do certain tests but how far do other electricians on here go?

But live testing is NOT the same as live working, ie. putting a new feed in. Daz
 
Well, what a strange twist of fate that happened around 4 oclock this afternoon. Contractor fitting new SWA feed to new aircon unit. I was in the room next door and all of sudden there was the most amazing buzzing and cracking sound followed by an almighty bang. Then more buzzing and the lights and all the PCs in the office went off.

Opened the door to the next room and there are flames around 1 foot long shooting out of the board. Luckily the spark is still standing - I thought he would be on the floor to be honest. The insulation on the cables was also on fire.

Anyway, luckily he is OK. The large 3 phase Merlin DB isn't, and the isolator on it is more like a lump of charcoal.

I reckon the HSE will have a field day.

Makes you think eh. I'll remember that noise forever - imagine the biggest electric welder you've seen and multiply the noise and humming by around a hundred!

Work Safe. Daz
 
.......all of sudden there was the most amazing buzzing and cracking sound followed by an almighty bang......there are flames around 1 foot long shooting out of the board. Luckily the spark is still standing .
Yep, learning the hard way. Live working is fine if you've been trained to do it and are capable of assessing the risks involved plus there should always be another trained person present. As already pointed out for general sparkies it's not something that should be necessary. Customer convenience is not a reason that requires things to be worked on live regardless how adamant they are that the power can't be interrupted so don't ever let them persuade you otherwise against your better judgment.
 
Last edited by a moderator:
Well, what a strange twist of fate that happened around 4 oclock this afternoon. Contractor fitting new SWA feed to new aircon unit. I was in the room next door and all of sudden there was the most amazing buzzing and cracking sound followed by an almighty bang. Then more buzzing and the lights and all the PCs in the office went off.

Opened the door to the next room and there are flames around 1 foot long shooting out of the board. Luckily the spark is still standing - I thought he would be on the floor to be honest. The insulation on the cables was also on fire.

Anyway, luckily he is OK. The large 3 phase Merlin DB isn't, and the isolator on it is more like a lump of charcoal.

I reckon the HSE will have a field day.

Makes you think eh. I'll remember that noise forever - imagine the biggest electric welder you've seen and multiply the noise and humming by around a hundred!

Work Safe. Daz
Out of interest, do you know what caused the incident?
 
But live testing is NOT the same as live working, ie. putting a new feed in. Daz
In both scenarios at some point you're going to have your pinkies inside an energised distribution board though. If you're competent at your job, I'm struggling to see why connecting a circuit into a board is such a significant leap in risk. Both jobs carry a degree of risk and yes in the ideal situation I wouldn't do it live, but switching off the whole installation just isn't a realistic option in a lot of cases. I wouldn't encourage anyone to be reckless or work beyond what they feel happy with but installing a new circuit, providing you're competent isn't what I'd deem recklessly unsafe thing to do.
 
In both scenarios at some point you're going to have your pinkies inside an energised distribution board though. If you're competent at your job, I'm struggling to see why connecting a circuit into a board is such a significant leap in risk. Both jobs carry a degree of risk and yes in the ideal situation I wouldn't do it live, but switching off the whole installation just isn't a realistic option in a lot of cases. I wouldn't encourage anyone to be reckless or work beyond what they feel happy with but installing a new circuit, providing you're competent isn't what I'd deem recklessly unsafe thing to do.
maybe in some old boards with bare busbars etc then i would have second thoughts about working on it live but even then i might it depends on the install and i mean drilling it not connecting btw
 
Last edited:
But live testing is NOT the same as live working, ie. putting a new feed in. Daz

A glance at the Memorandum of Guiodance on the EAWR will tell you otherwise. Para. 203, with reference to REulation 14, "'Work' is not confined to electrical work, but includes any work activity." Good luck convincing a court of law that testing isn't working.

To be legal, working on or near a live conductor, it has to be ubreasonable in all the circumstances for the conductor to be dead, reaonable in all the circumstances for you to be at work on or near it while it is live, and also requires precautions to be taken to prevent injury. It will never be accepted in law that inconvenience to the customer, or the fact that someone previously did as reasons to be doing it. You can say it's not so, but it is, and easily proved.
 
A glance at the Memorandum of Guiodance on the EAWR will tell you otherwise. Para. 203, with reference to REulation 14, "'Work' is not confined to electrical work, but includes any work activity." Good luck convincing a court of law that testing isn't working.

To be legal, working on or near a live conductor, it has to be ubreasonable in all the circumstances for the conductor to be dead, reaonable in all the circumstances for you to be at work on or near it while it is live, and also requires precautions to be taken to prevent injury. It will never be accepted in law that inconvenience to the customer, or the fact that someone previously did as reasons to be doing it. You can say it's not so, but it is, and easily proved.

Live tests need to be done on a live circuit :-)
 
Live tests need to be done on a live circuit :-)


I'm not saying otherwise, I'm responding to your assertion that testing is not work. Legally, it is. All of which is really irrelevant to the OP. The law in that case is even clearer. There is no convincing argument to be made on live work when the only criterion is the desire of the customer not to switch their supply off because it's incovenient.
 