R
rapido
Hi there,
I was thinking of arranging to put a meter for a tenant's building, and since I had a meter lying around, I was thinking of installing it myself.
However to my disappointment, it appears to be a three phase meter (red, yellow, blue, black wires) and the supply is single phase (red, black).
Is there any possibility to successfully use the meter on the supply, or is it time to buy a single phase meter?
Many thanks in advance,
-regards,
rapido
I was thinking of arranging to put a meter for a tenant's building, and since I had a meter lying around, I was thinking of installing it myself.
However to my disappointment, it appears to be a three phase meter (red, yellow, blue, black wires) and the supply is single phase (red, black).
Is there any possibility to successfully use the meter on the supply, or is it time to buy a single phase meter?
Many thanks in advance,
-regards,
rapido