- Reaction score
- 12,559
Mainly to make room for the others that hadn't gone in yet. The SWA feeds were installed in phases over about 24 months. I didn't do the calcs myself as I was working for a firm at this time, but I'm pretty sure it will have been taken into account.
The installation method was decided by the lead sparks on the job, also not me.
The installation method was decided by the lead sparks on the job, also not me.