no visual damage to insulation,no burrs or sharp edges on cable entries, metal back boxes earth, correct connection of conductors,can't remember the last one
 
just about didn't even touch on it in the course just from memory. i put 150mm from floors, ceilings and corners, straight lines vertically or horizontally between accessories? can't bring myself to check in the on-site guide tonight

- - - Updated - - -
 
just about didn't even touch on it in the course just from memory. i put 150mm from floors, ceilings and corners, straight lines vertically or horizontally between accessories? can't bring myself to check in the on-site guide tonight

- - - Updated - - -
dont think its from floors..

- - - Updated - - -

did mine today when do results come out ?
 
dont think its from floors..

- - - Updated - - -

did mine today when do results come out ?

your right just looked its not from floors, we've been told 6 weeks will be starting 2395 before we get the results from night
 
what did you put for the information given to tester from designer relating to final circuits ? or something along those lines ....
 
Make sure you learn how to test an earth electrode using temporary earth rods etc as it came up in my 2395 yesterday and I had no idea
 
what did you put for the information given to tester from designer relating to final circuits ? or something along those lines ....
really blagged this one i put design current, ambient temperature thats all i could think off in the last few mins

what about the pv question
 
what did you put for the information given to tester from designer relating to final circuits ? or something along those lines ....

a designer would give a tester info such as expected / calculated Zs , R1+R2 . Ib & protective device type / size.
 