How many out there are ensuring that their plant carries a valid label and not one that's been made up (not suggesting anyone would!)

As most will be aware site plant requires 3 monthly tests.
 
I think that's more of a suggestion than a requirement, and even then it's meant more for chippies who seem to think it's ok to go around sawing through cables and having to "wiggle the lead" is just one of those things you have to do sometimes.
 
It is a suggestion from the IEE however if it went to court during an investigation the Health and Safety at Work Act would be used.

For example how can you prove the plant was in operation condition for its correct use, the only valid way would be to follow the suggestion from the IEE.

Remember prior to BS7671 the Wiring Regs wasn't a legal requirement, think it was the early 90's they became a BS.
 
I reckon my defence would be that I'm qualified to inspect & test my own gear so I would know what to look out for in terms of damage, ie it is visually inspected before, during and after use.
 

OFFICIAL SPONSORS

Electrical Goods - Electrical Tools - Brand Names Electrician Courses Green Electrical Goods PCB Way Green 2 Go Pushfit Wire Connectors Electric Underfloor Heating Electrician Courses Heating 2 Go
These Official Forum Sponsors May Provide Discounts to Regular Forum Members - If you would like to sponsor us then CLICK HERE and post a thread with who you are, and we'll send you some stats etc

Advert

Daily, weekly or monthly email

Thread starter

Joined
Location
North Lanarkshire

Thread Information

Title
Your own plant
Prefix
N/A
Forum
Electrical Testing & PAT Testing Forum
Start date
Last reply date
Replies
4

Thread Tags

Advert

Thread statistics

Created
Wully,
Last reply from
Adam W,
Replies
4
Views
1,690

Advert

Back
Top