J
Johnuk
You wouldn't find me messing with water or gas thats for sure
same here with the plumbing side,
You wouldn't find me messing with water or gas thats for sure
yes....well gas is smelly stuff for a start.....there again so is bog water.....same here with the plumbing side,
2. Do you want to extend the equipotential zone or make outbuilding stand alone TT. I personally would more than likely extend zone as its TN S and install EMT in outbuilding.
Had this situation on a recently completed job, when DNO upgraded main fuse too 100A he said a spike will be needed for the outhouse, said it didn't matter if EMT was installed or not, regs said fault current couldn't pass through existing build (about 40m away) though he couldn't tell me which reg and my employer reckoned EMT would've been more than the earth electrode.
still never found why, in a book anyway.
Any ideas ?
2. Do you want to extend the equipotential zone or make outbuilding stand alone TT. I personally would more than likely extend zone as its TN S and install EMT in outbuilding.
Had this situation on a recently completed job, when DNO upgraded main fuse too 100A he said a spike will be needed for the outhouse, said it didn't matter if EMT was installed or not, regs said fault current couldn't pass through existing build (about 40m away) though he couldn't tell me which reg and my employer reckoned EMT would've been more than the earth electrode.
still never found why, in a book anyway.
Any ideas ?

Whoever told you that, (and it was probably the meter guy) was talking out of his arse, total load of nonsense!!
it beggars belief that you can insult people who have genuine questions from scenarios in the real world and still not provide justification. Not all of us have had the opportunities others may have.