K
Knobhead
You can give the customer a deckle edged scroll if you want. 99.9% won’t even know what it is!
The one thing that you are going to do is a Zs test to prove what you've done works. At stupid o clock your client doesn't want you there a second longer than you have to be so you get in get it done and get out, if you want to do a full spectrum of tests you make an appointment for a better time then your butt is covered every which way.
Which bit of South Shields (god's own country) are you from mate?
If you're relying on call-outs to supplement your income then you are in for a nasty surprise. Very few people will get you out in the night, and those that do will usually rely on someone they already know or have been recommended.
What are you planning to do if you get to a fault and it turns out that notifiable work is needed to sort it? Are you part P registered, or will you simply tell them you can't do the job and to get someone else?
Finally, no offence, but you seem very unsure of what is required in a domestic situation regarding notification/certification/testing. I'm sure that you are very well qualified in the electrical field you are in, but trust me, it's a different ballgame dipping your toes in domestic work...I found that out the hard way when I moved from being an industrial electrical engineer. Very few installs are compliant and no 2 properties will be the same. Believe me, working in an environment where things are done properly is a breeze compared to what's out there in peoples' homes...
If you are serious then get yourself a copy of the regs (if you don't already have one), the on-site guide, electricians guide to the building regs, plus GN3 & GN8.
As a side note, like for like is all fine and dandy unless manufacturers instructions specify something different such as fan replacements. Most of these now need 3 amp protection regardless of whether there is one there already.
The Democratic People's Republic of Chi mate. Where men are men and so are some of the womenWhiteleas mate, and you ?

I understand I might not get much work but at least I would have everything in place for any that does come my way, I served my time with the local council 3 years ago so been working in homes for 7 year now but mainly empty homes. I'm fully aware of what is and isn't notifiable but to be honest I'm sure you all know the reputation councils get and il be the first to admit its not up to scratch in the electrical department, people just know enough to get them bye, not many real good sparks who know their stuff work there.
As I was saying though when I'm at work in an empty home it's easy for me to quickly check everything out like rcd protection and making sure earthlings upto scratch and do full tests, I basically don't leave the property with any limitations or departures on sheets and complete everything that needs doing before the next tenant goes in, so that's why I'm askin everyone wether that's still required or impractical to do tht on a call out because I'm not
Too aware of limitations or departures coz everthings normally brought up to date
And no I don't think the AA would do that mate try ringing and asking
so say if its like for like do i not need to worry about anything else about the instalation or do any testing or produce a MWC?
i mean i would normally check everything out to make sure sockets arent spured off spurs and making sure lights are earthed etc, but if its 4 in the morning i wouldnt fancy taking bulbs out or appliances for Ir tests and testing rings thoroughly etc