The only time I have seen anything like that is in TSB Banks probably 20 years ago where some special circuits are fed by essential and non essential supplies, but the switching arrangement was catered for this, when one supply was killed the other then took over but control gear was in place to stop back feeding, I didn't get too involved with it as I was helping another spark on the job at the time not running the job, that set up you have shown Sintra is dangerous by the look of it and needs disconnecting from one board, it looks strange for sure, is there anything else connected before the switch on one of the feeds?
 
No mate straight from the 2 MCB's to the switch. Guys have been tracing out all the lighting circuits on one floor this weekend and they are all fed from 2 MCB's will pop up a wee drawing in a few minutes.
 
Here is a schematic of the wiring layout :confused:
 

Attachments

  • image.jpg
    image.jpg
    79.8 KB · Views: 69
That looks to be intentional.
A fail safe back up for the wiring installation, with no switching between the 2 required.

It must be a Hospital or High security building, Prison maybe??

If it's not the U.K it must be permitted and must be familiar to persons who normally work on that type of system
 
Have to meet the premises officer and the facilities manager tomorrow afternoon so hopefully they will be able to shed some light on it.
 
This setup is used on railway in places for essential equipment. Delve into it further before disconnecting, if its only lights tho I can't see why it would need to be! Is this building domestic or commercial?
 
Yes very confusing, I still think it may be an essential / non essential system somehow, (looks that way to me) and due to the generator, seems like it may have something to do with that, but the schematic doesn't make sence and seems almost dangerous, sorry fella, I don't think I can help with this one and it mut be something we UK sparks don't get involved with, hence the confusion, maybe tony or E54 may have an idea when they see the drawing Fella.

Mike
 
This particular floor is mostly individual offices of varying sizes with a couple of tea points and a couple of toilets.
 
Yes very confusing, I still think it may be an essential / non essential system somehow, (looks that way to me) and due to the generator, seems like it may have something to do with that, but the schematic doesn't make sence and seems almost dangerous, sorry fella, I don't think I can help with this one and it mut be something we UK sparks don't get involved with, hence the confusion, maybe tony or E54 may have an idea when they see the drawing Fella.

Mike

Cheers mate seems a bit dangerous to me also that's why I'm going to get to the bottom of it.
 
I have used MS Word for a sketch similar to that ...

But for real drawings, you can't beat Autocad.
 
Seen it and installed it where two or more substations would be linked for ancillary power and lighting. Mind you I did fit change over switches on the inter-linking feeds. As we pulled the 11KV cables in a couple of 433V cables would go in at the same time.
 
It is potentially dangerous, as effectively you are doubling the size of the protection on the circuit!
 