M
MDJ
The only time I have seen anything like that is in TSB Banks probably 20 years ago where some special circuits are fed by essential and non essential supplies, but the switching arrangement was catered for this, when one supply was killed the other then took over but control gear was in place to stop back feeding, I didn't get too involved with it as I was helping another spark on the job at the time not running the job, that set up you have shown Sintra is dangerous by the look of it and needs disconnecting from one board, it looks strange for sure, is there anything else connected before the switch on one of the feeds?
