I have about 70 wylex split load boards and 1000s of MCbs left in the container and my lads are still installing them at the moment since i cant get hold of any 17th boards and any rcbos,

My question is, do i have to start fiiting 17th boards since the 1st of july or can i get away with the 16th boards for a few weeks?? cos of lack of stock. we fit at least 5 boards a day
 
I would say you should be sourcing some RCBOs,Has anyone else found these dual RCD boards are to bloody big half the time to fit into the spaces anyway.
 
I have about 70 wylex split load boards and 1000s of MCbs left in the container and my lads are still installing them at the moment since i cant get hold of any 17th boards and any rcbos,

My question is, do i have to start fiiting 17th boards since the 1st of july or can i get away with the 16th boards for a few weeks?? cos of lack of stock. we fit at least 5 boards a day

well technically, if you DESIGNED the job before 1st of July, you can still install install to the 16th

if you know what i mean;)
 

OFFICIAL SPONSORS

Electrical Goods - Electrical Tools - Brand Names Electrician Courses Green Electrical Goods PCB Way Green 2 Go Pushfit Wire Connectors Electric Underfloor Heating Electrician Courses Heating 2 Go
These Official Forum Sponsors May Provide Discounts to Regular Forum Members - If you would like to sponsor us then CLICK HERE and post a thread with who you are, and we'll send you some stats etc

Advert

Daily, weekly or monthly email

Thread starter

Joined
Location
Darlington
Website
http://www.electrician-darlington.com

Thread Information

Title
16th edition boards
Prefix
N/A
Forum
Electrician Talk | All Countries
Start date
Last reply date
Replies
4

Advert

Thread statistics

Created
vardymr2,
Last reply from
PAUL M,
Replies
4
Views
2,132

Advert

Back
Top