I have about 70 wylex split load boards and 1000s of MCbs left in the container and my lads are still installing them at the moment since i cant get hold of any 17th boards and any rcbos,

My question is, do i have to start fiiting 17th boards since the 1st of july or can i get away with the 16th boards for a few weeks?? cos of lack of stock. we fit at least 5 boards a day
 
I would say you should be sourcing some RCBOs,Has anyone else found these dual RCD boards are to bloody big half the time to fit into the spaces anyway.
 
I have about 70 wylex split load boards and 1000s of MCbs left in the container and my lads are still installing them at the moment since i cant get hold of any 17th boards and any rcbos,

My question is, do i have to start fiiting 17th boards since the 1st of july or can i get away with the 16th boards for a few weeks?? cos of lack of stock. we fit at least 5 boards a day

well technically, if you DESIGNED the job before 1st of July, you can still install install to the 16th

if you know what i mean;)
 