I have about 70 wylex split load boards and 1000s of MCbs left in the container and my lads are still installing them at the moment since i cant get hold of any 17th boards and any rcbos,

My question is, do i have to start fiiting 17th boards since the 1st of july or can i get away with the 16th boards for a few weeks?? cos of lack of stock. we fit at least 5 boards a day
 
H

homesafe

I would say you should be sourcing some RCBOs,Has anyone else found these dual RCD boards are to bloody big half the time to fit into the spaces anyway.
 
S

Shakey

I have about 70 wylex split load boards and 1000s of MCbs left in the container and my lads are still installing them at the moment since i cant get hold of any 17th boards and any rcbos,

My question is, do i have to start fiiting 17th boards since the 1st of july or can i get away with the 16th boards for a few weeks?? cos of lack of stock. we fit at least 5 boards a day
well technically, if you DESIGNED the job before 1st of July, you can still install install to the 16th

if you know what i mean;)
 
P

PAUL M

well technically, if you DESIGNED the job before 1st of July, you can still install install to the 16th

if you know what i mean;)
:D how much longer do you think this will be a valid cop out :D
 
Electrical2Go - Online Electrical Supplier
This official sponsor may provide discounts for members

Reply to 16th edition boards in the Commercial Electrical Advice area at ElectriciansForums.net

Scolmore Electrical Products
This official sponsor may provide discounts for members
Top Bottom