Exposed connector blocks above ceiling tiles supplying lights etc... C2??
Main 3 phase cut out, tails to Meter for shop, then an old MICC, not terminated into an enclosure, pot exposed and conductors direct to cut out feeding a meter in another part of the building. Now I know it's a DNO problem and I'm ringing them tomorrow but do I need to code this on the EICR? If so C1? It's in a storage area and if anything were to knock the MICC the cables would be likely damaged, or the pot.
Cheers all.
Exposed connector blocks above ceiling tiles supplying lights etc... C2??
Main 3 phase cut out, tails to Meter for shop, then an old MICC, not terminated into an enclosure, pot exposed and conductors direct to cut out feeding a meter in another part of the building. Now I know it's a DNO problem and I'm ringing them tomorrow but do I need to code this on the EICR? If so C1? It's in a storage area and if anything were to knock the MICC the cables would be likely damaged, or the pot.