I wonder if it's on a 1.5mm or 2.5mm final circuit![]()
And a TT system with a Rcd (the readings not good enough for a Mcb)
I wonder if it's on a 1.5mm or 2.5mm final circuit![]()
i nssem to remember eng54 saying he had a 3kW shower in cyprus for some time.
...It wasn't "3kW",it was "Golden"...and what happens on holiday,stays on holiday :icon12:
Lol!!!...It wasn't "3kW",it was "Golden"...and what happens on holiday,stays on holiday :icon12:
No,not notifying anyone.They are also unlikely to be suitable for the situation.
Have they given notice to the local Water co. of the proposed works?
They'll assess what is required.
Failure to notify can have implications for the owner AND anyone installing showers, water heaters etc,
.

Well everything available on the market has been suggested now, looks like your customer wants something which doesn't exist then?
)Many thanks for all the posts chaps. I'll be talking to client next week and see how far she wants to go. (with the shower that is.....)
The best advice for them
They need these 2 items
No 1 to rectify the problem and
No 2 to keep proof of the rectification
![]()
![]()