sparks1973
you can break out the cables for the ring final at a convenient point (outlet)..for your end to end resistances....and can also cross em for R1 R2 at the outlet...it doesn`t need to be at the C/U....same for IR....It’s a TNS system, and at the moment, there are two consumer units one with MCB’s supplying the kitchen extension and the lighting, and the other ( an old Mem wooden box) with 30 Amp fuses supplying the two ring mains for upstairs, downstairs and a 15 amp fuse for the boiler radial. The old MEM box has had a cupboard built round it so now you can only open the lid just enough to get the fuse out, but you cannot get access to the wires at all.
I have explained the benefits of RCD’s to the client, and that I cannot test the ring circuit as I cannot access the cables without damaging the consumer unit, so the first job here is to change the two consumer units for a single 17[SUP]th[/SUP] edition, giving me chance to run the standard tests on the rings and radial while changing the unit.