unless you intend to work live .

personally, and it's only my humble opinion, but how the hell could he work if he was dead.
:jester:

some of the sparks ive worked with might as well have been!!! infact i think i could have got more work from a corpse.. :)
 
I am doing the work myself. I will then get an electrician to test & inspect it. The question was the best was to extend service cable by a meter. Smokey


Carefull mate, you cant go saying things like that on this forum, you'll get eaten alive by the 'rules are rules' brigade.

To answer your question, there is nothing wrong with extending cables with correct sized JB's. If you're gonna get a sparky to test, cert and register it then find one and agree with him first because not all sparks will be willing to do this (it's not entirely legal). If the tails from the meter aren't long enough then replace them. You'll have to cut the seals off of course and the suppliers don't like that but IMO if they should've given us DP isolaters if they didn't want their stuff tampered with.
But thats a whole different thread.
 
Thank you all for some solid advice - I will have a look at Henly Blocks and Adaptable Blocks with the DIN rails. I am going to have a word with the council about the notafiable electrical work and see how possible that it, if not I will fall back to chatting with the electricans. Telling them the plan and then using them to wire up the CU to the meter. No I would not work live - thats in an unecassary risk (if I can't get an electrician out, I will phone the comnpany for a temporary disconnection). In response to the question I have a calibrated and in date - Flukes 89 and Meggers MIT420, the MIT injects a voltage so not a problem. Many thanks Smokey
 