Thank you all for some solid advice - I will have a look at Henly Blocks and Adaptable Blocks with the DIN rails. I am going to have a word with the council about the notafiable electrical work and see how possible that it, if not I will fall back to chatting with the electricans. Telling them the plan and then using them to wire up the CU to the meter. No I would not work live - thats in an unecassary risk (if I can't get an electrician out, I will phone the comnpany for a temporary disconnection). In response to the question I have a calibrated and in date - Flukes 89 and Meggers MIT420, the MIT injects a voltage so not a problem. Many thanks Smokey