went to job today to wire a utility room within converted garage , this part was fine . house 3year old

builder gives me a shout saying hall lights and stair lights plus living room lights not working :S all i have done at this point is mount boxes
builder proceeds to tell me the moved 2 light switches the other day re routing cables about 2 meters back and down to new switch point , OKAYYYYY lol

switches in question control lighting in kitchen so i have a look and all ok except 1 2core cable lying disconnected asked y and he replied it blows fuse when its connected :S.
IR it 0.00
hmmmm
i asked can you be definite that you didnt damage it , put nail through it etc of course he replied yes
he then said they took away the joist the cables where coming down through at existing point ,
so i asked how did you support joist when you did that
"we didnt it just fell and the switch boxes stopped it" :O :O :O

so i took a REALLY educated guess and cut the cable in question back about a meter stripped it and tested >999 Mohms
the full weight of the joist had fell and the cable in question stopped it in the process of being internally damaged and was heat damaged