O
Octopus
Its not, he has brought it level to the DPM.
No need to slope back to the property at all, he's just put the edging in about 200mm to high. It helps if firstly you get your ground work right.
Anyway his answer was, I will rip it out and start again. :angry_smile:
Silly me, I always thought that a path/patio had to be below the DPM!