Its not, he has brought it level to the DPM.

No need to slope back to the property at all, he's just put the edging in about 200mm to high. It helps if firstly you get your ground work right.

Anyway his answer was, I will rip it out and start again. :angry_smile:

Silly me, I always thought that a path/patio had to be below the DPM!
 
Silly me, I always thought that a path/patio had to be below the DPM!

Yea me too !!!!!!

Anyway he's been told, level base, lay on wet mix ! and finish below the at least 2 bricks below the DMP

Thing was if he had just lifted the existing and laid on the old base he would have been at the right level.

I did have a chuckle when he put the edge in, :hammer:.
 
This is my problem with rated people and the others alike. If I wired in some cables how do the customer know I have done it correctly to the current regs, the correct size cable etc. they don't. It's like the blind leading the blind! If I turn up on time, crack on with some work ad don't leave til late. Make sure the customer is always happy then I'm guaranteed a 5 star rating


Unfortunatley there will always be the few that spoil it for the rest of us, my work is always invoiced and if nessecerry the correct certificates issued, therefore my work is traceable as i have nothing to hide and take pride in the fact that all my work complies to regs and is of a high standard. I have just insisted to a rated people customer that i need to come to see a job before i quote and the other day i went to look at a job and the guy said that the other guy that rang him up wanted something stupid like £140 just to come out,
 
150mm below damp proof is whats recommended in regs i think

As stated above, an ACO linear drain into the surface water drain would be grand. Also saves having all the water run off onto the lawn and water log that
 
Builders are not all bad I have a hungerian guy in roughcasting my house and he could teach anyone about work ethics and pride. I got him recommended by a few folk in th local and he turns up at 8 and works till 4 always cleans up and his work is spot on!. My old man who happens to be a structural engineer had a nosy at it and he was well impressed.
 

OFFICIAL SPONSORS

Back
Top