Can anyone please, tell me is there any sign of breach of Building Regulations here? My new build has been built with space for a single meter box, however, a second one was installed at a later stage. The latest borescope inspection has revealed that there is no lintel above the second box and DPC or cavity tray is missing, also the second box is installed a lot higher than 1100mm from Gr.level. I have also noticed that there multiple unnecessary holes incorrectly cut (sharp edges) to cable entry position.
please, if is any qualified Electrical Engineer to give me some advice, I will much appreciate it.
Just a quick note: The house is still under NHBC warranty.
please, if is any qualified Electrical Engineer to give me some advice, I will much appreciate it.
Just a quick note: The house is still under NHBC warranty.
Attachments
-
IMG_0378.jpeg128.3 KB · Views: 129
-
IMG_0380.jpeg129.2 KB · Views: 127
-
3c.JPG100.2 KB · Views: 121
-
3d.JPG50 KB · Views: 120
-
DSC_7751.JPG46.9 KB · Views: 116
-
IMG_0224.jpeg141.3 KB · Views: 115
-
IMG_0225.jpeg155.2 KB · Views: 111
-
IMG_2150.jpeg95.4 KB · Views: 113
-
IMG_2160.png650.1 KB · Views: 117
-
IMG_2129.jpg193 KB · Views: 117