Still think OP's on about using the 3c & earth cable, i.e. using cpc as a line conductor.
I suspect he’s actually done it that way and come here for confirmation he’s done it correctly ........

He's not been back since lunchtime. Probably lying down in a darkened room; can't blame him from some of these replies![]()
He viewed this thread at 5 pm ....
I think we all need this some days.He's not been back since lunchtime. Probably lying down in a darkened room; can't blame him from some of these replies
Still, need isolator for the boiler.If it's a system boiler and the programmers in the airing cupboard (which I think the op said) then the 3c&e will be fine. L, N, SL & E.
No pump overun needed as the pumps in the boiler
Still, need isolator for the boiler.