If the boiler needs only sw live,N and earth and the programmer is a two-channel stand-alone programmer then could have the existing supply have the programmer there and put an isolator before the boiler.
 
If it's a system boiler and the programmers in the airing cupboard (which I think the op said) then the 3c&e will be fine. L, N, SL & E.
No pump overun needed as the pumps in the boiler
 
If it's a system boiler and the programmers in the airing cupboard (which I think the op said) then the 3c&e will be fine. L, N, SL & E.
No pump overun needed as the pumps in the boiler
Still, need isolator for the boiler.
 