It seems this thread could get out of hand 1st geordie sparks i don't know Dan? 2nd telectrix i have been a spark for over30 years mostly on industrial and to me a good night sleep and a happy customer is very important
It seems this thread could get out of hand 1st geordie sparks i don't know Dan? 2nd telectrix i have been a spark for over30 years mostly on industrial and to me a good night sleep and a happy customer is very important
It seems this thread could get out of hand 1st geordie sparks i don't know Dan? 2nd telectrix i have been a spark for over30 years mostly on industrial and to me a good night sleep and a happy customer is very important
no disrespect, to you AA4120, but i would have thought that with your experience, you should know that choc blocks floating around without an enclosure was pants.
and beware of the split ring. this is where diy'er or bob the builder splits a ring final and takes 1 leg to a socket or 2, and the other leg to another socket or 2, thus making 2 radials from 1 32A MCB. if you're lucky, 2.5mmcable has been used. on the 1 i found last year, builder has used 1.0mm 3 core. so 4 sockets were wired in 1.0mm, protected at 32A.
I do agree Guitarist but as i explained most of my experience has been industrial and not domestic so the short time i have had on domestic has been an eye opener and to see what people do to cut corners to save a few quid
you'll see a lot worse than that on domestics, mate. a favourite among the diy brigade is to cram 7 or 8 cables into a junction box, using a 3 terminal box when a 4 terminal one is needed, then twisting the bare cpc's on the outside ( that's if they even bother with cpc's.