mayfair
Ok guys prepared to be shot down with all sorts a rules,regs and numbers but just something that may help somebody out.
Ive been working on my own in a biggish villa with quite complicated runs and switching arrangments The power cables are not due for about 3-4 weeks so as the ceilings etc were all gonna be plastered up and i have some of my junction boxes up there was a bit concerned that id missed a link or something out (as if) so Took my 12v drill battery with a couple a clips and powered (as such) my circuits up one at a time I have made some plugs with 12v led and buzzer in and plugged them in to the various outlets also made some ES 12 LED units and stuck em into my lighting plus a 12v led soldered into a GU10 base checked all my switches will do all my continity checks later when ive sorted the rest but these inexpensive little units gave me a bit a peace a mind............Might sound like crap idea to you but it helped.
Ive been working on my own in a biggish villa with quite complicated runs and switching arrangments The power cables are not due for about 3-4 weeks so as the ceilings etc were all gonna be plastered up and i have some of my junction boxes up there was a bit concerned that id missed a link or something out (as if) so Took my 12v drill battery with a couple a clips and powered (as such) my circuits up one at a time I have made some plugs with 12v led and buzzer in and plugged them in to the various outlets also made some ES 12 LED units and stuck em into my lighting plus a 12v led soldered into a GU10 base checked all my switches will do all my continity checks later when ive sorted the rest but these inexpensive little units gave me a bit a peace a mind............Might sound like crap idea to you but it helped.