- Dec 9, 2010
- 7,461
- 817
- 1,688
- If you're a qualified, trainee, or retired electrician - Which country is it that your work will be / is / was aimed at?
- United Kingdom
- What type of forum member are you?
- Practising Electrician (Qualified - Domestic or Commercial etc)
starting job next thursday adjusting a heating system..
there currently is one heating sytem for 3 parts of a building which is rented out as doctors , dentist and a flat...
we plan to change the 2 channel time clock for a 4 channel timeclock and add 4 new valves , doctors heating, dentist heating, flat above heating and hot water ..
adding a stat in each area as their control of heat..
so isit l-n-e to wiring centre, 3 stats wired bk to wiring centre, and cylinder stat and programmer..
so these will be set to come on at times of 8 -6 and if is a good day they can turn their stat down to stop heating comming on..
i know a balls but im getting there..
any tips before i carry out my story
there currently is one heating sytem for 3 parts of a building which is rented out as doctors , dentist and a flat...
we plan to change the 2 channel time clock for a 4 channel timeclock and add 4 new valves , doctors heating, dentist heating, flat above heating and hot water ..
adding a stat in each area as their control of heat..
so isit l-n-e to wiring centre, 3 stats wired bk to wiring centre, and cylinder stat and programmer..
so these will be set to come on at times of 8 -6 and if is a good day they can turn their stat down to stop heating comming on..
i know a balls but im getting there..
any tips before i carry out my story