P
peterpan
I have to connect up a check meter. Is it ok to terminate the 2 armourds into 4" metal trunking. Then use henley blocks to terminate the feed/loads, and come out of them with double insulated tails into the check meter?

no it doesnt say substantiial but it does say in accordance with reg526.5....wish people would refer to the book ...![]()
