Don't forget if you have more than 10ma leakage (think that's the correct value it's in the OSG anyway) you have to connect the cpcs (if it's a RFC) separate terminals on the cu, and use socket outlets with two earth terminals if it's a radal the the same applies to the sockets and you need to make the cpc a ring. It's all very clear in the OSG but mine is at work and I;m chillin out.