A
andekoch
Just been asked to price the following, labour only.
1) remove 4 spot lights from bathroom and replace with a central light, including repair holes left by spots.
2) replace kitchen light fitting with another unit.
3) new socket off an existing spur (1.5m away and needs to be a RCD fused spur since old installation has no RCD protection).
4) replace 2 light switches
5) bond water to CU (no external met), approx 2m away on the other side of the wall and is boxed in so remove boxing and put back as well.
6) move outside light 4m from current position.
I guessed this can be done in 2 days but the home owner thinks that is too long. What do you think?
1) remove 4 spot lights from bathroom and replace with a central light, including repair holes left by spots.
2) replace kitchen light fitting with another unit.
3) new socket off an existing spur (1.5m away and needs to be a RCD fused spur since old installation has no RCD protection).
4) replace 2 light switches
5) bond water to CU (no external met), approx 2m away on the other side of the wall and is boxed in so remove boxing and put back as well.
6) move outside light 4m from current position.
I guessed this can be done in 2 days but the home owner thinks that is too long. What do you think?