Any of the energy suppliers can trace the MPAN if you quote them the whole meter ID number and the post code.
Also, do you actually need a 3ph system on a house build? It would be cheaper to get a whole new supply put in and probably a much cheaper 1ph would suffice.
Oh, and you probably won't satisfy your voltage drop requirements with that size of cable over that length, btw.