W
whits1
Hey all! ive been asked to quote for a 3 bed semi-detached property. its a full re-wire 3 bed including d/room, 5 d/sckts in lounge, 4 d/sckts in d/room, 4 in kitch + Cooker Switch & point and spurs for fan, D/W, W/M, and F/F.
s/sckt in hall and landing, 4 d/sckts in main bed and 3 d/sckts in other beds, 2x heat detects, 2 x co2 detects, 2x smokes, front and back o/s lights, obviously all lights, the consumer unit change, wire for combi heating, all earthing and bonding to current regs, testing all chased and plastered after, including all materials + light in loft and socket.
oh! and wire for electric shower!!
and its in central london.
and has to be completed in 2 days,
Think thats pretty much it,
was looking around £2500???
is that sounding about right anyone?
Thanks all
s/sckt in hall and landing, 4 d/sckts in main bed and 3 d/sckts in other beds, 2x heat detects, 2 x co2 detects, 2x smokes, front and back o/s lights, obviously all lights, the consumer unit change, wire for combi heating, all earthing and bonding to current regs, testing all chased and plastered after, including all materials + light in loft and socket.
oh! and wire for electric shower!!
and its in central london.
and has to be completed in 2 days,
Think thats pretty much it,
was looking around £2500???
is that sounding about right anyone?
Thanks all