Water Heater Circuit was labelled on the CU, but not installed, as this had previously been removed before we moved in. Heating system has had a complete overhaul. I assume the Water Heater relates to the Immersion Heater that would have been in the hot water cylinder on the old system.

New boiler is located at the opposite end of the house, under the stairs. Originally, it was located just inside the side door, hence the minor building site in one of the pictures through the door. No RCD FCU has been installed, just a basic Switched FCU under the stairs near the new boiler.

I immediately thought the certificate was mickey mouse / jackanory / laurel and hardy when it arrived with RCD tests on it, as it isn't and never looks to have been RCD protected. I have verified that the boiler is on the stated MCB, simply by flicking the MCB into the off position, and watching the boiler neon tell-tale extinguish.

I will be on to NIC in the morning, the company in question seems to get a lot of referrals from the plumbing company, so I will be ringing those too!

TBH fictional certs are rife....I've also seen one with rcd trip times with out an rcd in the house,and recently saw one with ring circuit readings for a radial!
That does not excuse it,even more so as this is an approved contractor rather than just a DI.....make sure the NIC take action,follow your complaint up and dont be fobbed off. As an approved contractor ourselves this sort of thing gives us all a bad name,
 
I think most probably the NICEIC will want you to contact the contractor first to see if it can be sorted out amongst yourselves. If you get no luck via that route I believe they will then step in as arbittraitors.

Not that I am speaking from experience, it's just that, that is how I understand the system works.

As NICEIC contractors they will have to keep a register of any complaints that they receive about the technical aspects of any of their work but not contractural
 