With Biff on this one,RCD test is just that,a test on a specific device.IR and R1 / R2 tests confirm satisfactory operating criterea of device.If you had to test it with loads connected,which would you choose to be connected/on/off or any combination?
 
I do have them on their own line, but have always recorded the disconnection times on the circuit line, as this is where I measured it , Do you record it on the RCD line and put N/A on each circuit line?
 
Ok fair enough. I have pulled the GN3 off the shelf and it does say the load should be disconnected for the test.

So you had the info all along and didnt bother to follow it ????

Then you claim my explainations were unclear in a completely ungrateful manner after i spent over an hour on the thread ???

Now youre still reluctant to do the testing as advised even though its alot quicker and easier just because you dont understand the science behind it ???

You're just all over the place to be honest.
 
I do have them on their own line, but have always recorded the disconnection times on the circuit line, as this is where I measured it , Do you record it on the RCD line and put N/A on each circuit line?
I just leave it blank, but that's because I only test the RCD, not each circuit ;)
 
With Biff on this one,RCD test is just that,a test on a specific device.IR and R1 / R2 tests confirm satisfactory operating criterea of device.If you had to test it with loads connected,which would you choose to be connected/on/off or any combination?

Usually on as this mirrors a real life situation, where a fault may potentially develop.
 
So you had the info all along and didnt bother to follow it ????

Then you claim my explainations were unclear in a completely ungrateful manner after i spent over an hour on the thread ???

Now youre still reluctant to do the testing as advised even though its alot quicker and easier just because you dont understand the science behind it ???

You're just all over the place to be honest.

Get over yourself. This forum is a place for discussion of technical issues. Please do not take every question raised as a personal attack. I simply debated a matter of recording disconnection times in the hope it would stimulate an intelligent debate.

If you find this offensive, simply do not answer. I do not owe you any kind of gratitude for joining the discussion. I queried a method of recording disconnection times which was raised by the original poster, people posted various answers, I re-checked my literature on the subject, and admitted I was wrong.

What do you want ? A bunch of flowers?

With regards to your comment, there is no 'science' behind sticking probes onto the RCD at the CU. A child of three could do it.The most complicated thing about electrical installations are the regulations that govern it.
 
Last edited by a moderator:
biff and the boys are totally right here...
1) Test your R1+R2 to ensure the circuit complies with EFLI
2) Test the RCD at the CU with loads disconnected
3) Assuming they conform, put the readings on the test sheet. Personally I put the same reading down for each line related to said RCD, tho many do the " sign. Don't put N/A, as it IS applicable.

All sorted now, sleep well :)
 
Get over yourself. This forum is a place for discussion of technical issues. Please do not take every question raised as a personal attack. I simply debated a matter of recording disconnection times in the hope it would stimulate an intelligent debate.

If you find this offensive, simply do not answer. I do not owe you any kind of gratitude for joining the discussion. I queried a method of recording disconnection times which was raised by the original poster, people posted various answers, I re-checked my literature on the subject, and admitted I was wrong.

What do you want ? A bunch of flowers?

With regards to your comment, there is no 'science' behind sticking probes onto the RCD at the CU. A child of three could do it.The most complicated about electrical installations are the regulations that govern it.

Maybe you should give testing a miss till you know what youre doing.
And i prefer chocolates.
 
Been an outside observer on this one til now.....but the Crosswire has certainly lived up to his name in this thread! The RCD testing we do is just that....a test to confirm that the RCD works! The circuit itself has already been tested by the time you do the RCD test. The testing done on the circuit to verify EFLI ensures that the fuse or MCB will operate (or circuit breaker element of the RCBO) within the required time. The RCD is there as additional protection, and as long as you check that it's working, then everything's fine!
 
I've admitted I was wrong, but I erred on the side of caution. I would rather be overly cautious than not cautious enough. Still thanks to this thread I will shave many minutes off my testing
 
I've admitted I was wrong, but I erred on the side of caution. I would rather be overly cautious than not cautious enough. Still thanks to this thread I will shave many minutes off my testing

It's always better to double-check if you're not sure mate. There is actually nothing wrong with testing the RCD/RCBO at the end of a circuit, just as long as there are no loads connected which (as you discovered) can give strange readings. In fact, it's easier to use the plug-in adaptor on the MFT to test the RFC RCD's at a nearby socket before plugging all the equipment back in, than it is to do so at the CU. :)
 
Hmmm...rcd tests at the CU only eh?...shweet that'll save some testing time from now on.

Like crosswire i always tested at the end of each circuit but gonna change me ways now after reading through this.

For all those who gave this old dog a new trick you can share in the left over Coffee/Orange Revels from this big bag......mainly cos i hates them.
 
No probs with asking jimmy lol.
The rcd manufacturers recommend testing of the devices in this way for a start.
Plus the test is just to acertain the trip time of the rcd , so theres no need for any other part of circuit to be connected.
And finally , electronic gizmo's can interfere with the readings , as shown by ste macs query.

Biff has hit the nail on the head with this one. The manufacturers instructions always take precedence over any other guidance, whether that is for installation, testing or whatever.

Cheers..............Howard
 
So you had the info all along and didnt bother to follow it ????

Then you claim my explainations were unclear in a completely ungrateful manner after i spent over an hour on the thread ???

Now youre still reluctant to do the testing as advised even though its alot quicker and easier just because you dont understand the science behind it ???

You're just all over the place to be honest.

Biff your tall on knowledge and frankly short on manners, and this is exactly what ****es people off, you clearly are an educated spark so WTF do you need to antagonise people ?..You have the knowledge base so use it to educate matey. I dunno if you get a kick out the wind up..but it's not an attractive trait, I say again you are clearly talented, so wind your neck in and see what is in front of you
J
 