Can I suggest that you post as many pictures as you can. of the DB, breakers/RCDs/equipment/tags on the gear etc etc........
You mentioned you supply to shed is 2.5 if im right this means you cant upgrade this mcb without upgrading the shed supply and i wont make suggestions because it really needs to be looked into on site .. a little bit of missed info' could end up with you getting incorrect advice.So if I don't find a problem at the workplace tomorrow then I could upgrade to 32a and place cable with 6mm?
Is this in the same building you were going to have demolished?