D Deleted member 26818 Apr 16, 2019 #33 As far as I’m aware, both new circuits and Consumer Units require notification.
D Deleted member 26818 Apr 16, 2019 #35 Well Regulation 12-(6A) (b) does refer to replacement. So perhaps a new CU that is not a replacement, is not notifiable?
Well Regulation 12-(6A) (b) does refer to replacement. So perhaps a new CU that is not a replacement, is not notifiable?