A
andrew8902
Hi, how can I connect my Kewtech R2 lead to my Metrel MFT so that I do not have to carry the R2 reel with me whilst doing R2 testing? There was never an issue using a Megger but the Metrel utilises a block connector instead of 3 individual leads.
Thanks
Thanks
