Discuss Using a Metrel MFT with a R2 long lead in the Electrical Testing & PAT Testing Forum area at ElectriciansForums.net

Reaction score
22
Hi, how can I connect my Kewtech R2 lead to my Metrel MFT so that I do not have to carry the R2 reel with me whilst doing R2 testing? There was never an issue using a Megger but the Metrel utilises a block connector instead of 3 individual leads.
Thanks
 
Will the wander lead not piggy back into one of the Metrel test leads?

On a side note I use a shoulder strap for my wander lead reel, saves carrying it.
 
As @Strima said, you use the 3 lead set. Plug blue into green and then plug your wander lead into the back of the blue. Then null out the lot. If you’re still confused I can post a picture for you.
 
I've been using a Megger R2 reel with my Metrel for years
 
I always put the drum at the other end so I don't have to carry it. I wind out the lead first to the furthest point. I removed the outer casing as it never wound up properly so I just have a bare drum and the lead manually wound up on it.
 

Reply to Using a Metrel MFT with a R2 long lead in the Electrical Testing & PAT Testing Forum area at ElectriciansForums.net

Similar Threads

Hi All New to this forum, have read the posts on here from google but only recently signed up. I'm having some issues and some input would be...
Replies
13
Views
2K
Hi guys and gals, I have a question about the leads to computers (commonly known as kettle leads). I am new to PAT testing so please bear with...
Replies
0
Views
991
Hi all, We have a limited in house PAT testing requirement and were advised that the TIS700 fitted our needs. The unit works fine for 110V and...
Replies
0
Views
714
Hi, My Kewtech KT63DL has just come back from its annual calibration without any issues, but Ive just taken it to site and attempted to do the...
Replies
3
Views
1K
Hi, I currently have a Megger 1730 v1 which is fine for all functions except the 2 wire (L-E) no trip loop test, (no 3 wire loop test on my 1730)...
Replies
0
Views
373

OFFICIAL SPONSORS

Electrical Goods - Electrical Tools - Brand Names Electrician Courses Green Electrical Goods PCB Way Electrical Goods - Electrical Tools - Brand Names Pushfit Wire Connectors Electric Underfloor Heating Electrician Courses
These Official Forum Sponsors May Provide Discounts to Regular Forum Members - If you would like to sponsor us then CLICK HERE and post a thread with who you are, and we'll send you some stats etc

YOUR Unread Posts

This website was designed, optimised and is hosted by untold.media Operating under the name Untold Media since 2001.
Back
Top
AdBlock Detected

We get it, advertisements are annoying!

Sure, ad-blocking software does a great job at blocking ads, but it also blocks useful features of our website. For the best site experience please disable your AdBlocker.

I've Disabled AdBlock