A

andrew8902

Hi, how can I connect my Kewtech R2 lead to my Metrel MFT so that I do not have to carry the R2 reel with me whilst doing R2 testing? There was never an issue using a Megger but the Metrel utilises a block connector instead of 3 individual leads.
Thanks
 
Will the wander lead not piggy back into one of the Metrel test leads?

On a side note I use a shoulder strap for my wander lead reel, saves carrying it.
 
  • Like
Reactions: andrew8902
As @Strima said, you use the 3 lead set. Plug blue into green and then plug your wander lead into the back of the blue. Then null out the lot. If you’re still confused I can post a picture for you.
 
  • Like
Reactions: andrew8902
I've been using a Megger R2 reel with my Metrel for years
 
I always put the drum at the other end so I don't have to carry it. I wind out the lead first to the furthest point. I removed the outer casing as it never wound up properly so I just have a bare drum and the lead manually wound up on it.
 

Similar threads

OFFICIAL SPONSORS

Electrical Goods - Electrical Tools - Brand Names Electrician Courses Green Electrical Goods PCB Way Electric Underfloor Heating Electrician Courses Heating 2 Go Electrician Workwear Supplier
These Official Forum Sponsors May Provide Discounts to Regular Forum Members - If you would like to sponsor us then CLICK HERE and post a thread with who you are, and we'll send you some stats etc

Advert

Daily, weekly or monthly email

Thread Information

Title
Using a Metrel MFT with a R2 long lead
Prefix
N/A
Forum
Electrical Testing & PAT Testing Forum
Start date
Last reply date
Replies
6

Advert

Thread statistics

Created
andrew8902,
Last reply from
Vortigern,
Replies
6
Views
3,269

Advert