Are place got a c1 for no schedule , c1 for using SY c1 for missing RCD testing sticker c1 for no bonding to water mains (when Ch is bonded and incoming is plastic ) he was from the insurance and tried to c1 everything . Don't think he could count past 1

I'd have asked to see his qualifications to do the job!
 
mickfred is in Liverpool.the guy who gave all them C1's needs to get income from remedials, as his previous job has become rdundantdue to the ever increasing use of security locking wheel nuts. :oops::oops::oops:,
 
Code 3 for no Circuit chart and then FI for untraced circuits . Any FI on a report mean its unsatisfactory .
How can it be potentially dangerous not to have a circuit chart ?
 

OFFICIAL SPONSORS

Electrical Goods - Electrical Tools - Brand Names Electrician Courses Green Electrical Goods PCB Way Green 2 Go Pushfit Wire Connectors Electric Underfloor Heating Electrician Courses Heating 2 Go
These Official Forum Sponsors May Provide Discounts to Regular Forum Members - If you would like to sponsor us then CLICK HERE and post a thread with who you are, and we'll send you some stats etc

Advert

Daily, weekly or monthly email

Thread starter

Joined
Location
Wirral
Business Name
Farm electrics

Thread Information

Title
What code would you give for the following
Prefix
N/A
Forum
Periodic Inspection Reporting & Certification
Start date
Last reply date
Replies
19

Thread Tags

Advert

Thread statistics

Created
Farmelectrics,
Last reply from
mickfred,
Replies
19
Views
4,799

Advert

Back
Top