28 years ago yesterday (23/11/95) I started subbing as a ''boy (at the age of 42) to a company installing lighting in a new tunnel, initially one sparks (Bob, very Scottish and an initial language/accent barrier but we laughed about it and got over the problem) and me to get the feel of how the job should run. We spent 3 weeks installing conduit and stainless steel boxes on the roof, 2 weeks installing stainless steel unistrut cable bearers in the pits. Then started pulling in 4mm² singles into 32mm tubes. The company supplied a 6m steel tape and our tube runs spanned four 5ft fluo fittings so over 6m & not long enough so we were using a piece of single. The problem was pulling 14* 4mm² singles (from 14* 1000m drums!) was a heavy pull even for the 6m tube and the single used as a draw wire kinked so could only be used about 3 times. For the second day of cable pulling I took in my 144ft nylon fish which was long enough to do a whole bay of 4-5 sections (or 80-100ft) and with carefull management and feeding we pulled in the whole bay. I found the secret was to keep the drums turning by forming a 'slack loop' in line with the tube in between bobs pulls.For conduit I like my nylon draw tape.
Gosh they aint cheap these days
Now as you will all know that length of nylon fish has a mind of its own but Bob and I had it down to a fine art, I'd feed it in, he'd drive the scissor lift the along the line and direct the fish into the continuing tube at each box, then pull the excess right through at the end of the run, throwing it over to one side. I'd attatch the singles and we'd draw in, as he returned he fish out the wires required at each box and trailed the end of the fish back to me to start again. A whole week without any errors or slip ups and we had completed about 20% of first fix - as far as we could - in one bore.
Basically Bob and I were left to manage our own work, we did more conduit until 2 more sparks were taken on, the 2 scissor lifts were transferred to the other bore and they started on conduit. We did loads of unistrut until 2 more scissor lifts were on site then back on cable pulling, we searced high and low for the nylon fish, eventually the van driver let on the new guys had used it and it was in the skip, it was all knotted, tangled cut into shorter pieces and obviousely driven over - oh and of course total denial.
Bob and Sunray were not impressed, particularly as newer versions were not as long, IIRC I think I could only find 10m at the time although I think I've seen longer since but I have to say it was not as nice to handle or as easy to use as the old one.