Sorry can't find the picture I was thinking of.
Give me one of these any day. If you can't fix it with a hammer, get a bigger hammer.
Welman 170+40+10 Ton. Three hoists, two cross travels. The smaller 40+10 cross travel could pass under the 170T. and to make it more fun, there's two cranes on the same track. And it happened more than once, two cranes colliding. With each weighing in at 175 tons, it was one hell of a crash.
I was involved in one. I’d got 40T on the hook, the other 70T. 460 Tons head on, thank god we were both travelling slowly, they could shift on full notch. We still managed to bend the OLEO buffers up at 45°