L
Leesparkykent
Last edited by a moderator:
Quality DB change I come across this morning. Whoever done it has extended nearly every circuit with 15amp block including the ring final circuits. And look at the quality SWA termination in to the wiska box.
I apologize for the pics loading upside down.
View attachment 28579
View attachment 28580
View attachment 28581
View attachment 28582
Hae' you bin workin downunder agin today L?
Quality DB change I come across this morning. Whoever done it has extended nearly every circuit with 15amp block including the ring final circuits. And look at the quality SWA termination in to the wiska box.
What zone is that CU installed in ... ?
Some great pics Kamikaze ...just hoping these are not your back catalogue in disguise![]()
my mission....... to make this comply. apart from what you can see, the PME earthing is "exported" to 4 caravan hook-ups.
View attachment 28587
![]()
Found this a couple of weeks back !!!
the old twist and tape then?![]()
Nice neutral connection
![]()
Nice earth connection on the same cable, was just shoved through a hole in the bottom of the mcc.
![]()
There aren't any crimps underneath that tape!
Whoever had done it had just splayed the cores and pushed them together. I think you'd struggle to twist 70mm