This is one of many procedures to follow and probably the most important...
So what are all your thoughts ? (By the way I'm new to this forum)
 
Mek sure Geordies fridge with his 'broon' in has a multiple key lock Isolator and he has 'ALL' the keys.........simple really:):tounge_smile:
 
LOTO

Lock Off Tag Out (or variations of the wording)

Record all lock outs with a permit and have then in a common location (dependent on the building) but the lock should ideally be capable of accepting multiple padlocks to prevent accidental energising of the circuit, clearly not possible with MCB locks!
 
Lot's of variations of safe isolation, which is also often attached to ''permit to work'' procedures. So you can go from the very basic procedure LOTO (a one man band affair) to the insane!! The most intense system i've ever worked with, was on the MTR (underground railway system) in Hong Kong, after and/or while track side was energised. A permit to work lock and tag from just about everyone and his dog was needed!! lol!!
 
Lot's of variations of safe isolation, which is also often attached to ''permit to work'' procedures. So you can go from the very basic procedure LOTO (a one man band affair) to the insane!! The most intense system i've ever worked with, was on the MTR (underground railway system) in Hong Kong, after and/or while track side was energised. A permit to work lock and tag from just about everyone and his dog was needed!! lol!!

But can you imagine the consequences if someone in the food chain still had their people track-side when someone else turned the power back on
 
But can you imagine the consequences if someone in the food chain still had their people track-side when someone else turned the power back on

The HK MTR is not a live rail system, but an overhead catenary system. Not saying that a safe permit system wasn't needed in these tunnels, far from it, but the system the Brit based H&S contract dept had going, was just insane!! Eventually when the MTR maintenance dept took the system over, got modified, with the removal of all the unnecessary dross. In fact with a system that was in place on the working 1st phase of the project...
 
The HK MTR is not a live rail system, but an overhead catenary system. Not saying that a safe permit system wasn't needed in these tunnels, far from it, but the system the Brit based H&S contract dept had going, was just insane!! Eventually when the MTR maintenance dept took the system over, got modified, with the removal of all the unnecessary dross. In fact with a system that was in place on the working 1st phase of the project...

I dare say they had a generic based on the London Underground system and others in Europe that use a live rail system, they would have been better adopting the track side safety procedures of the overhead trains by the sounds of that.
 
I dare say they had a generic based on the London Underground system and others in Europe that use a live rail system, they would have been better adopting the track side safety procedures of the overhead trains by the sounds of that.

Not according to the seconded London Underground Rail Signalling Engineer, who was also the SRE, of that department. He was the main guy that had the majority of the run-ins with them. He could regularly be seen spitting feathers at these guy's (among others) at every site meeting and on almost a daily basis!! lol!!
 
Not according to the seconded London Underground Rail Signalling Engineer, who was also the SRE, of that department. He was the main guy that had the majority of the run-ins with them. He could regularly be seen spitting feathers at these guy's (among others) at every site meeting and on almost a daily basis!! lol!!

Sounds about right, I know a few Guys who worked on the Jubilee line extension project and they bemoaned the consultants all the time for being over the top on some of the safety regs they enforced...
 
Best EV Chargers by Electrical2Go! The official electric vehicle charger supplier.

OFFICIAL SPONSORS

Electrical Goods - Electrical Tools - Brand Names Electrician Courses Green Electrical Goods PCB Way Green 2 Go Pushfit Wire Connectors Electric Underfloor Heating Electrician Courses Heating 2 Go
These Official Forum Sponsors May Provide Discounts to Regular Forum Members - If you would like to sponsor us then CLICK HERE and post a thread with who you are, and we'll send you some stats etc

Advert

Daily, weekly or monthly email

Thread Information

Title
Safe isolation procedures.
Prefix
N/A
Forum
Periodic Inspection Reporting & Certification
Start date
Last reply date
Replies
16

Thread Tags

Advert

Thread statistics

Created
STONEZZZ,
Last reply from
PEG,
Replies
16
Views
3,246

Advert

Back
Top