What new regs are you referring to Moaz?
What new regs are you referring to Moaz?
Not in force yet, wire your house to comply with the 17th18th Edition?
Best you look at the calculations
... Where is the CU going to be?
Volt drop springs to mind
You haven't been reading the French regs have you?
Is that actually coming into force? Radial per room? That’s a joke.
thats a bit fritzlBest idea ever. (If it's true). You are not looking at this correctly.
If the kids are not doing as they are told or spending too much time on their console you can isolate their room without affecting any other rooms. Everyone happy... Except for the kid who isn't doing as they are told..
What about the other circuits, lighting etc if it's a HMO?Lol no!! I've allowed for a CU on each floor. Very big house! It'll save me alot of time and money running a few legs back to the CU to make it in to a ring. I might just wire them as radials.
Best idea ever. (If it's true). You are not looking at this correctly.
If the kids are not doing as they are told or spending too much time on their console you can isolate their room without affecting any other rooms. Everyone happy... Except for the kid who isn't doing as they are told..
What about the other circuits, lighting etc if it's a HMO?
Is that actually coming into force? Radial per room? That’s a joke. Unnecessarily filling up the DB..
Ive read the 18th draft and didn't see that one. Where did you see it Moaz?
Is that actually coming into force? Radial per room? That’s a joke. Unnecessarily filling up the DB..
same here.
Maybe I misunderstood. I'll check it tonight.
Where will you be checking tonight? Where did you see it originally?
As far as I've understood. It's true, unless someone can correct me.
Originally another spark mentioned it. And a few weeks later, I heard someone else mention it too. I've not checked the draft myself, but I need to now.
Yes I have that as well no mention regarding the OPs post as far as I can seeThis is what I have as info.
the best way to learn not to stay up all night is to have to wake up early and feel like ----How?
Yeh right calculate earth leakage!
not if there are seperate CU's on each floor, depends how big the "floor" is though, it might be 10 small box rooms or david camerons houseAnyway Moaz wire it how you like. You know the property and it's layout.
Just be aware of you cable lengths and do your calcs...and you may need to do 4mm radials if the property is that big..
R1+Rn (which you can get from Onsite guide)multipled by the rating of fuse you want to use multipled by the correction factor of 1.2 (70c)
Simple job done.
not if there are seperate CU's on each floor, depends how big the "floor" is though, it might be 10 small box rooms or david camerons house
Surely if the implementation of arc protective devices is imminent this would be another reason to use radial circuits...??
HMO?? I'm thinking her majesties something?
more like an old folks home, their own rooms sometimes their own toilet, shared kitchen and living areaStudent digs type places?
Why a hot potatoe?