I know this has been posted about before but I am not 100% sure reading the posts.
2 meters registered to one address. One meter in house and one in a building some way away with independent supplies. Outbuilding has direct connection to the power lines over pole. Looks like only single phase coming into the outbuilding but may be 3 phase available.
Can we install 2 x 4kw arrays under G83 and will we get highest FIT for each. The power will be fed to the house and the outbuilding separately.
Do different suppliers have different views or is there a regulation that applies?
2 meters registered to one address. One meter in house and one in a building some way away with independent supplies. Outbuilding has direct connection to the power lines over pole. Looks like only single phase coming into the outbuilding but may be 3 phase available.
Can we install 2 x 4kw arrays under G83 and will we get highest FIT for each. The power will be fed to the house and the outbuilding separately.
Do different suppliers have different views or is there a regulation that applies?