robertoj

Hi guys Im doing electrician course 2357 and I have problem Assignment 305 with some questions anyone can help me??? Waiting for reply Thanks!
 
Hi for example: 1.during installation of the main trunking system within Block L,various amounts of cutting and drilling through the building structure is required.Describe two ways in which the fabric and structural integrity of the building can be maintained?

2.Risk assessment and method statement for measuring and marking out?

3.Describe the installation practice and procedures to ensure that the containment systems integrity is maintained during the installation process in order to ensure that no damage will occur to the wiring system or its components?
 
Upvote 0
Go on then what's the question? my dinners ready at 13:30 so we have a couple of hours left before I'm to p&ssed to worry about it
 
Upvote 0
Go on then what's the question? my dinners ready at 13:30 so we have a couple of hours left before I'm to p&ssed to worry about it
Hi first one 1.risk assessment and method statement for measuring and marking out
 
Upvote 0
Apologies Robert, as a new member your first 6 posts need manually approving by a staff member. Your future posts should appear instantly from now on.
 
Upvote 0
Go on then what's the question? my dinners ready at 13:30 so we have a couple of hours left before I'm to p&ssed to worry about it

Didn't see this reply sorry mate, you could probably get a sample RA from the net, suppose the second bit is reffering to keeping covers on etc PS I'm not p$ssed yet, gettin there though
 
Upvote 0
hi for installation of the lighting circuit within the workshop,toilets,restroom That contains the conduit(pvc and metallic)
 
Upvote 0
hi for installation of the lighting circuit within the workshop,toilets,restroom That contains the conduit(pvc and metallic)

ok risk assessment.

so whats the risks when you working at heights ?

Falling objects, dust .....

who is at risk, risk level, ....
[TABLE="align: center"]
[TR]
[TD="align: left"] [FONT=&quot] [/FONT]

[/TD]
[/TR]
[/TABLE]



Method Statement


- Arrive at site and report to site office or site manager.
- Wear all PPE necessary as Construction Site Management Board states, or as health and safety briefing states.

- All work must comply with any relevant regulations, being; Health and safety at work act 1974, Electricity at work regulations 1989, Electricity wiring regulations BS 7671 2008. COSHH regulations 2002.

next step ............

just think material,tools etc and how will you be using them?
 
Upvote 0
You need to come in with some answers Rob and we will comment.
Nobody is going to give you word for word stuff that you can copy and paste.
Lets have a post from you for each question and your thoughts on each.

Boydy
 
Upvote 0
You need to come in with some answers Rob and we will comment.
Nobody is going to give you word for word stuff that you can copy and paste.
Lets have a post from you for each question and your thoughts on each.

Boydy
1.during installation of the main trunking system within Block L,various amounts of cutting and drilling through the building structure is required.Describe two ways in which the fabric and structural integrity of the building can be maintained?



2.Describe the installation practice and procedures to ensure that the containment systems integrity is maintained during the installation process in order to ensure that no damage will occur to the wiring system or its components

*
the first one question is to plan running cables???
*take care when fitting the systens(conduit,trunking )???
someone

can someone clearer explain that thanks
 
Last edited by a moderator:
Upvote 0
You would need to provide more detail than that, I think you are not trying too hard!

Minimising the size of penetrations , complying with Part A of the building regulations, resealing the fabric around penetrations are good starting points.

Correct design of the containment system to minimise sharp direction changes, proper preparation of the containment (filing down, sanding cut edges), ensuring smooth bends, ensuring an adequate number of draw points are installed, ensuring suitable support for the containment both on the surface to which it is affixed and for the method and frequency of supports would be a good ideas to expand on.
 
Upvote 0
You would need to provide more detail than that, I think you are not trying too hard!

Minimising the size of penetrations , complying with Part A of the building regulations, resealing the fabric around penetrations are good starting points.

Correct design of the containment system to minimise sharp direction changes, proper preparation of the containment (filing down, sanding cut edges), ensuring smooth bends, ensuring an adequate number of draw points are installed, ensuring suitable support for the containment both on the surface to which it is affixed and for the method and frequency of supports would be a good ideas to expand on.
thank you
 
Upvote 0

OFFICIAL SPONSORS

Electrical Goods - Electrical Tools - Brand Names Electrician Courses Green Electrical Goods PCB Way Green 2 Go Pushfit Wire Connectors Electric Underfloor Heating Electrician Courses Heating 2 Go
These Official Forum Sponsors May Provide Discounts to Regular Forum Members - If you would like to sponsor us then CLICK HERE and post a thread with who you are, and we'll send you some stats etc

Advert

YOUR Unread Posts

Daily, weekly or monthly email

Thread Information

Title
2357 305 Task A,B
Prefix
N/A
Forum
Electrician Courses : Electrical Quals
Start date
Last reply date
Replies
20
Unsolved
--

Thread Tags

Tags Tags
None

Advert

Thread statistics

Created
robertoj,
Last reply from
robertoj,
Replies
20
Views
12,768

Advert

Electrical Courses

This is the main Electrical Courses at ElectriciansForums.net. Find local recommended electricians courses. Avoid training "company" scams. Always go view the training centre before booking any electrical courses.
Back
Top