Not that long this is my first major job to be honest, the guy im working with want to do everything as cheap as chips so it seems, which does tend to be annoying because they have no regards for the regs, for example the fuse board upgrade will mean i have the space to put kitchen and sockets on their own mcb, so they are 2 seperate circuits at the mo but on one MCB?but they dont want to know about all that they just want it to work, and in regards to doing a cert i will have to pass it off as unsatisfactory due to thiswhy? because they are not seperate circuits? and if the wiring is as old as the fuse board you can guarantee when testing it will be crap not necessarily, also on visual the bonding on gas and water was only like 6mm as long as it is there and tests ok this can be left the whole installation looks really old & i dont want them to think im ripping them off by recomending rewires ?? any advice