I don't really agree. Keeping inconvenience to a minimum is not the same as saying that it must be no more inconvenient than it was before.To my mind split load boards are acceptable for new builds, but when used as a replacement, frequently they do not comply because inconvenience has been increased rather than minimised.
Don't care about all that keeping inconvenience to a minimum guff.I don't really agree. Keeping inconvenience to a minimum is not the same as saying that it must be no more inconvenient than it was before.
Simply put it means consider the consequences of the design. And if you are happy that it is justified then so be it.
It's all down to ones interpretation of a particular reg dave. But quite frankly I've got more important things to worry about, like where I hide the gin bottles last night?Don't really get what everybody is trying to say here.? There are thousands of 16th ed CU's out there with up front RCD main switch, is that one big inconvenience.? RCBO'S, dual split boards and old boards as I mention,have got to be better than old rewire able,with no RCD protection at all.?
It does mean that. It doesn't state that cost etc. aren't considerations though.Can someone explain why 'minimising inconvenience' doesn't actually mean minimising inconvenience?
As for interpreting the Regs, why?
How about not interpreting them, and just doing what it says?
Can someone explain why 'minimising inconvenience' doesn't actually mean minimising inconvenience?
Is the reason why people interpret the Regs, simply because it's too hard to comply?
?


Don't need to alter anything, unless you incorrectly installed it.
What guidance do you need for that?
Use a metal CU, or a plastic CU in a metal cabinet.