Discuss Critical Feedback recent Consumer unit install Please. in the UK Electrical Forum area at ElectriciansForums.net
Board is being boxed in and have used some 2 by 1 to bring the board more forwardHello MrShine94
From my perspective and at first glance the terminations other than the Live of the bottom 16A Rcbo ,they look very neat
Is the board spaced out from the Plyboard ? the cables seem to have been squashed between the unit and the Ply
No they have not been shortened just tucked behindHave those fly leads been shortened?
Yes I could do with some of that current grommet strip is rubbish having to tape it onCrenellated grommet strip, dang it!!
everything is being boxed inCould be significantly improved by it not being made by Proteus.
How are the cables managed outside of the board ? Looks like they are just draped across the wall.
That was a previous board from same siteHavnt we seen this photo before?
looking at that c/unit there is a lot of juice being pulled ,what are the tails may I ask .
Main earth enters through a RPG.Do the main tails and main earth enter the same point?
Main earth enters through a RPG.
A what??Main earth enters through a RPG.
Using a Rocket Propelled Grenade to make a hole from the main house is a bit extreme...
Why ?Do the main tails and main earth enter the same point?
Mind you, they are stunningly effective indoors also!better used outdoors
Reply to Critical Feedback recent Consumer unit install Please. in the UK Electrical Forum area at ElectriciansForums.net
We get it, advertisements are annoying!
Sure, ad-blocking software does a great job at blocking ads, but it also blocks useful features of our website. For the best site experience please disable your AdBlocker.