N
nicebutdim
That Volex junction box was a nice find - might be one for @Lucien Nunes!
There is suspicion that it was by contractors not paid for work carried out during a plant upgrade that was never finished before the previous company went bust, or the management trying to get money back from their huge debts. They knew exactly what they were doing, knew what was fed from where. They switched off only the circuits that they were going to remove, and locked areas/cabinets were all opened by keys and not forced. 2 transformers feed the main building, they had cut the supply from 1 and refed that half of the building by closing a busbar coupling switch so the whole building is now fed from 1 transformer. 70-240mm2 swa cables were taken but only ones that powered plant equipment, not lighting or the overhead cranes. 16 large control panels for the plant were carefully removed and taken away and single and 3 phase maintenance sockets throughout had their cables carefully removed and then the sockets were screwed back on, at a glance the plant looked largely complete!Pikey signed for that lot.
Jesus, now that's something else. Some people really shouldn't be allowed to carry out electrical work.How to connect a new board to existing conduits which also act as cpcs.View attachment 88333View attachment 88334
How to connect a new board to existing conduits which also act as cpcs.View attachment 88333View attachment 88334
About five years ago I suggested a rewire as much of the wiring is 50+ years old. Whoever replaced the board have actually made it worse.Obviously a lot of thorough testing was carried out when the work was completed then eh.