Can anyone confirm this Earthing system please.
11KVA line to transformer.
Off the transformer line to 1 cable to house
Off other side of transformer to earth rod and 2nd line to house
At house outside. Transfers to DNO equivalent of 1 core swa with core connected to line and armour connected to 2nd cable. Also off 2nd cable is another single line going to MET in house.
DNO SWA goes to cutout as normal.
I first thought TNS from in the house due to seperate earth but now thinking PME.
I'm calling DNO tomorrow to confirm what it is
11KVA line to transformer.
Off the transformer line to 1 cable to house
Off other side of transformer to earth rod and 2nd line to house
At house outside. Transfers to DNO equivalent of 1 core swa with core connected to line and armour connected to 2nd cable. Also off 2nd cable is another single line going to MET in house.
DNO SWA goes to cutout as normal.
I first thought TNS from in the house due to seperate earth but now thinking PME.
I'm calling DNO tomorrow to confirm what it is