Hi everyone!! I'm new to this site so be gentle 
i have my my first assessment on Monday!! (7/12/15)
Ive done a CU change and tested, the NIC told me 1 job but seeing people saying 2 (some say 1 major 1 minor and others 2 majors for first assessment).
3 things really.
1) any advice?
2) I have tested the bonding to incoming oil and water service pipes. Oil is fine and am getting a ready but water pipe is showing O-L with vol on top (Megger mft1710), however when I test for voltage using voltage test selection on meter I'm getting no reading? Also incoming water pipe is plastic with copper coming off the top and going back to plastic speed fit pipe. I know that the rest of the install is a copper/plastic mix as had guys in ripping up kitchen floor due to leaking copper pipe that they replaced with plastic. Anyway I'm wondering what the NIC believe on bonding? I'm happy to quickly run a 10mm Earth from CU in garage to water mains and earth it as its only in the utility room next to garage.
3) customer has a broken neutral in one ring and doesn't want to pay for investigation, I have spent some time trying to find it but no luck as yet. Is this down to me to sort? The Zs also tested 5.31 at one socket but on returning another day it dropped to 1.18. It's a TN-C-S system and no one else has been there to touch it!! Any ideas?

i have my my first assessment on Monday!! (7/12/15)
Ive done a CU change and tested, the NIC told me 1 job but seeing people saying 2 (some say 1 major 1 minor and others 2 majors for first assessment).
3 things really.
1) any advice?
2) I have tested the bonding to incoming oil and water service pipes. Oil is fine and am getting a ready but water pipe is showing O-L with vol on top (Megger mft1710), however when I test for voltage using voltage test selection on meter I'm getting no reading? Also incoming water pipe is plastic with copper coming off the top and going back to plastic speed fit pipe. I know that the rest of the install is a copper/plastic mix as had guys in ripping up kitchen floor due to leaking copper pipe that they replaced with plastic. Anyway I'm wondering what the NIC believe on bonding? I'm happy to quickly run a 10mm Earth from CU in garage to water mains and earth it as its only in the utility room next to garage.
3) customer has a broken neutral in one ring and doesn't want to pay for investigation, I have spent some time trying to find it but no luck as yet. Is this down to me to sort? The Zs also tested 5.31 at one socket but on returning another day it dropped to 1.18. It's a TN-C-S system and no one else has been there to touch it!! Any ideas?